Home  /  Tiling & Home Renovation Work  /  Bathrooms

JOB — 01

Bathroom tiling & renovations.

SCOPE

Bathroom wall and floor tiling, from small repairs to wider renovations, in Bentleigh and surrounding Melbourne suburbs. I come to look at the room, I prepare the surfaces, and I lay the tiles. You deal with me throughout.

NEXT

FREE ON-SITE ASSESSMENT — DETAILED WRITTEN QUOTATION — BENTLEIGH & SURROUNDING SUBURBS

WHO DOES WHAT

Me.

The tiling is mine. Licensed work goes to licensed people.

I carry out the on-site assessment, removal of existing tiles where it’s part of the agreed scope, surface preparation, and the bathroom wall and floor tiling itself. I’m the person you talk to about how the work is planned and how it’s going.

Plumbing and electrical components are completed by appropriately licensed specialists. I don’t personally offer that work, and I don’t provide architectural design, engineering or a 24/7 emergency service. Urgent or weekend work may be possible by arrangement, depending on what’s already booked.

Read: Who Does What in a Bathroom Renovation →

OPTIONS

Repair, update or renovate?

Not every tired bathroom needs to be stripped back to the frame. Part of the assessment is working out which of these suits your room and your priorities.

REPAIR

A few cracked or loose tiles in an otherwise sound room. Targeted tile replacement and repairs may be enough, provided the surface behind them is in reasonable condition.

PARTIAL UPDATE

Retiling the floor, a shower area or a feature wall while other parts of the bathroom stay as they are. This can make sense when one surface is worn and the rest still works.

WIDER RENOVATION

New wall and floor tiling throughout, usually with plumbing and electrical stages completed by appropriately licensed specialists, and my tiling planned around them.

KEEP WHAT WORKS

If you’d like to keep the existing layout or certain fittings, tell me. I’ll explain honestly whether that’s practical for the tiling and what it might limit. More in Repair, Partial Update or Full Renovation?

A worker's hand removes protective material from a wall beside tile layout lines and an unfinished tiled section.

Wall surface marked out before tiling — ILLUSTRATIVE

NOTE — SURFACE PREPARATION

In my experience, proper preparation matters as much as the visible finish. A more expensive product cannot make up for an unsuitable or poorly prepared surface, especially in a room that gets wet every day.

Before any tile goes on, I look at the existing conditions: whether walls and floors are sound, flat and suitable for what you’ve chosen, and what needs doing first. Some of that can only be seen once the old finishes come off. That’s why preparation is planned, not rushed.

Surface Preparation →

QUOTE

What it takes depends on what's there.

Bathroom renovation costs, timeframes and work requirements depend on the existing property, the materials you select and the scope we agree. Any pricing I mention before seeing the room is general guidance only. A firm figure comes from a detailed written quotation after a free on-site assessment.

Concealed conditions, such as damage behind old tiles or an uneven substrate, may only become apparent once existing finishes are removed. If that happens, I’ll show you what I’ve found and talk through the options before going further. See What’s Under There? and On-site Assessment & Detailed Written Quotation.

BEFORE I VISIT, THINK ABOUT

Which surfaces bother you: floor, walls, shower area

What’s cracked, worn or no longer practical

The layout or fittings you’d like to keep

Tiles you have in mind, if any

Your suburb, whether that’s Bentleigh or nearby